Projects
Based in Sydney, we are a specialist sheet piling contractor with experience in the installation of soldier pile and bored contiguous pile retention systems, as well as driven timber, steel tube and steel universal column foundation piles.

See below for a selection of our projects across our areas of expertise.
Walgett Weir Fishway

Pensar

Walgett Weir Fishway

Installation of J-Steel Arcelor Mittal AZ 36 sheet piles up to 12.6 m long for fishway.‍

Pensar

Walgett Weir Fishway

Walgett Weir

Installation of J-Steel Arcelor Mittal AZ 36 sheet piles up to 12.6 m long for fishway.‍
NEWMARKET GREEN

Absolute Contracting

NEWMARKET GREEN

Installation of J-Steel Arcelor Mittal GU 7 S & AZ-14 single sheet piles x 6m, 9 m & 10 m for residential basement construction.

Absolute Contracting

NEWMARKET GREEN

RANDWICK

Installation of J-Steel Arcelor Mittal GU 7 S & AZ-14 single sheet piles x 6m, 9 m & 10 m for residential basement construction.
UNIVERSITY OF NSW SCIENCE & ENGINEERING BUILDING

Ford Civil

UNIVERSITY OF NSW SCIENCE & ENGINEERING BUILDING

Installation of J-Steel Arcelor Mittal GU 18 N sheet piles x 9 m long for construction of on-site stormwater detention tank.

Ford Civil

UNIVERSITY OF NSW SCIENCE & ENGINEERING BUILDING

KENSINGTON

Installation of J-Steel Arcelor Mittal GU 18 N sheet piles x 9 m long for construction of on-site stormwater detention tank.
CLARENCE RIVER BRIDGE

Fulton Hogan

CLARENCE RIVER BRIDGE

Hire, installation & extraction of J-Steel Arcelor Mittal GU 14 N, GU 18 N & PU 10 J sheet piles

Fulton Hogan

CLARENCE RIVER BRIDGE

GRAFTON

Hire, installation & extraction of J-Steel Arcelor Mittal GU 14 N, GU 18 N & PU 10 J sheet piles
7 - 9 BEACH ST

Astina Group

7 - 9 BEACH ST

Hire, installation & extraction of J-Steel Arcelor Mittal GU 7S sheet piles x 6 m & 8 m long for residential basement excavation.

Astina Group

7 - 9 BEACH ST

FORSTER

Hire, installation & extraction of J-Steel Arcelor Mittal GU 7S sheet piles x 6 m & 8 m long for residential basement excavation.
BRAYS DAM ESCAPE

John Holland Group

BRAYS DAM ESCAPE

Installation of J-Steel Arcelor Mittal GU 14 N & GU 18 N permanent sheet piles, 6 m, 9 m & 12 m long for upgraded dam spillway.

John Holland Group

BRAYS DAM ESCAPE

GRIFFITH

Installation of J-Steel Arcelor Mittal GU 14 N & GU 18 N permanent sheet piles, 6 m, 9 m & 12 m long for upgraded dam spillway.
EAST MIRROOL DAM ESCAPE

John Holland Group

EAST MIRROOL DAM ESCAPE

Installation of J-Steel Arcelor Mittal GU 14 N & GU 18 N permanent sheet piles, 3 m, 6 m & 9 m long for upgraded dam spillway.

John Holland Group

EAST MIRROOL DAM ESCAPE

YENDA

Installation of J-Steel Arcelor Mittal GU 14 N & GU 18 N permanent sheet piles, 3 m, 6 m & 9 m long for upgraded dam spillway.
SYDNEY UNIVERSITY NANOSCIENCE BUILDING

Mainland Civil

SYDNEY UNIVERSITY NANOSCIENCE BUILDING

Installation of J-Steel Arcelor Mittal GU 7S sheet piles x 8 m & 9 m long for temporary shoring wall.

Mainland Civil

SYDNEY UNIVERSITY NANOSCIENCE BUILDING

SYDNEY UNIVERSITY

Installation of J-Steel Arcelor Mittal GU 7S sheet piles x 8 m & 9 m long for temporary shoring wall.
1 BEACH ST,

MGR Projects

1 BEACH ST,

Installation of steel and timber soldier pile shoring for residential basement excavation.

MGR Projects

1 BEACH ST,

HUSKISSON

Installation of steel and timber soldier pile shoring for residential basement excavation.
HEXHAM

Macarthur Gas

HEXHAM

Hire, installation & extraction of Thyssenkrupp Infrastructure H 2507 double sheet piles x 18 m long and Larssen L 601 sheet piles

Macarthur Gas

HEXHAM

RELIEF RD

Hire, installation & extraction of Thyssenkrupp Infrastructure H 2507 double sheet piles x 18 m long and Larssen L 601 sheet piles
BROTHERSON DOCK CONTAINER TERMINAL

Duratec Australia

BROTHERSON DOCK CONTAINER TERMINAL

Installation & extraction of J-Steel Arcelor Mittal GU 23 N sheet piles x 12 m long for coffer dam for repairs to existing damaged precast concrete wharf structure.

Duratec Australia

BROTHERSON DOCK CONTAINER TERMINAL

PORT BOTANY

Installation & extraction of J-Steel Arcelor Mittal GU 23 N sheet piles x 12 m long for coffer dam for repairs to existing damaged precast concrete wharf structure.
16 EVANS AVE

Christie Civil

16 EVANS AVE

Hire, installation & extraction of J-Steel Arcelor Mittal GU 7 S sheet piles x 6m & 8m long.

Christie Civil

16 EVANS AVE

EASTLAKE

Hire, installation & extraction of J-Steel Arcelor Mittal GU 7 S sheet piles x 6m & 8m long.
23 BENELONG PKWY

Piety THP

23 BENELONG PKWY

Installation & extraction of J-Steel Arcelor Mittal GU 7 S sheet piles x 8 m long for construction of on-site stormwater detention tank.

Piety THP

23 BENELONG PKWY

WENTWORTH POINT

Installation & extraction of J-Steel Arcelor Mittal GU 7 S sheet piles x 8 m long for construction of on-site stormwater detention tank.
HEALEY CCT

Trinity Building

HEALEY CCT

Installation of steel and concrete plank permanent soldier pile shoring for excavations for industrial development.

Trinity Building

HEALEY CCT

HUNTINGWOOD

Installation of steel and concrete plank permanent soldier pile shoring for excavations for industrial development.
ELYSIUM APARTMENTS

Central Construct

ELYSIUM APARTMENTS

Installation of Thyssenkrupp Infrastructure SCH-5 sheet piles x 5 m, 6 m, 7 m long & Larrsen L 601 sheet piles x 8m long for residential basement construction

Central Construct

ELYSIUM APARTMENTS

TERRIGAL

Installation of Thyssenkrupp Infrastructure SCH-5 sheet piles x 5 m, 6 m, 7 m long & Larrsen L 601 sheet piles x 8m long for residential basement construction
65 WILLIS ST

Vantage Corp

65 WILLIS ST

Installation of steel and timber soldier pile shoring for excavations for residential development.

Vantage Corp

65 WILLIS ST

KINGSFORD

Installation of steel and timber soldier pile shoring for excavations for residential development.
M5 ENABLING WORKS, AIRPORT EAST PRECINCT

John Holland Group / Keller Foundations

M5 ENABLING WORKS, AIRPORT EAST PRECINCT

Installation of J-Steel Arcelor Mittal GU 14 N sheet piles x 6 m, 8 m & 11 m long for temporary shoring to allow construction of new rail underpass

John Holland Group / Keller Foundations

M5 ENABLING WORKS, AIRPORT EAST PRECINCT

MASCOT

Installation of J-Steel Arcelor Mittal GU 14 N sheet piles x 6 m, 8 m & 11 m long for temporary shoring to allow construction of new rail underpass
177 WYNDHAM ST

Excel Contracting

177 WYNDHAM ST

Installation of J-Steel Arcelor Mittal GU 7S sheet piles x 6 m & 8 m long for stormwater & gross pollutant trap & crane base shoring works.

Excel Contracting

177 WYNDHAM ST

ALEXANDRIA

Installation of J-Steel Arcelor Mittal GU 7S sheet piles x 6 m & 8 m long for stormwater & gross pollutant trap & crane base shoring works.
BP SERVICE STATION

Perich Constructions

BP SERVICE STATION

Hire, installation & extraction of TWK Steel NS-SP-10H sheet piles x 9 m long sheet piles for construction of on-site stormwater detention tank.

Perich Constructions

BP SERVICE STATION

444 WEST BOTANY ST, ROCKDALE

Hire, installation & extraction of TWK Steel NS-SP-10H sheet piles x 9 m long sheet piles for construction of on-site stormwater detention tank.
ORORA LONG DAM

Christie Civil

ORORA LONG DAM

Installation of TWK Steel Z-700 single sheet piles x 12 m long for lining of existing water supply dams's banks.

Christie Civil

ORORA LONG DAM

BANKSMEADOW

Installation of TWK Steel Z-700 single sheet piles x 12 m long for lining of existing water supply dams's banks.
BOMEN LINKS RD & UNDERPASS

BMD

BOMEN LINKS RD & UNDERPASS

Installation of AZ-36 double sheet piles x 7 m & 9 m long for temporary shoring to allow construction of new rail underpass.

BMD

BOMEN LINKS RD & UNDERPASS

WAGGA WAGGA

Installation of AZ-36 double sheet piles x 7 m & 9 m long for temporary shoring to allow construction of new rail underpass.
GREEN SQUARE STORMWATER DRAIN

Brefni

GREEN SQUARE STORMWATER DRAIN

Installation & extraction of J-Steel Arcelor Mittal GU 18 N & GU 14 N sheet piles x 8 m & 9 m long for stormwater pipe and pit shoring works.

Brefni

GREEN SQUARE STORMWATER DRAIN

ZETLAND

Installation & extraction of J-Steel Arcelor Mittal GU 18 N & GU 14 N sheet piles x 8 m & 9 m long for stormwater pipe and pit shoring works.
16 LODGE RD

Impero Constructions

16 LODGE RD

Installation of J-Steel Arcelor Mittal GU 7 S sheet piles x 6 m long for shoring walls for swimming pool construction

Impero Constructions

16 LODGE RD

CREMORNE

Installation of J-Steel Arcelor Mittal GU 7 S sheet piles x 6 m long for shoring walls for swimming pool construction
M4 WIDENING

CPB Contractors

M4 WIDENING

Installation & extraction of J-Steel Arcelor Mittal GU 7S sheet piles x 6 m, 8 m & 9 m long for precast steel UC soldier piles with timber lagging for piling platforms.

CPB Contractors

M4 WIDENING

PARRAMATTA

Installation & extraction of J-Steel Arcelor Mittal GU 7S sheet piles x 6 m, 8 m & 9 m long for precast steel UC soldier piles with timber lagging for piling platforms.
15-21 DOODY ST

MB Australia

15-21 DOODY ST

Installation of Larssen L 601 sheet piles x 7 m long for shoring walls for commercial basement excavation.

MB Australia

15-21 DOODY ST

ALEXANDRIA

Installation of Larssen L 601 sheet piles x 7 m long for shoring walls for commercial basement excavation.
PORT BOTANY KNUCKLE REDEVELOPMENT

McConnell Dowell

PORT BOTANY KNUCKLE REDEVELOPMENT

Installation and extraction of J-Steel Arcelor Mittal GU 7S sheet piles x 9 m long for 2 no. coffer dams.

McConnell Dowell

PORT BOTANY KNUCKLE REDEVELOPMENT

PORT BOTANY

Installation and extraction of J-Steel Arcelor Mittal GU 7S sheet piles x 9 m long for 2 no. coffer dams.
SYDNEY TRAINS CBD MAINTENANCE CENTRE BUILDING

Gartner

SYDNEY TRAINS CBD MAINTENANCE CENTRE BUILDING

Installation of steel soldier pile shoring with sheet pile infill for emergency shoring of failed existing retaining wall.

Gartner

SYDNEY TRAINS CBD MAINTENANCE CENTRE BUILDING

SURRY HILLS

Installation of steel soldier pile shoring with sheet pile infill for emergency shoring of failed existing retaining wall.
FOXGROUND-BERRY BYPASS

Fulton Hogan

FOXGROUND-BERRY BYPASS

Installation of 3 no. temporary bridges comprising 610 mm diameter CHS cased bored piles socketed 1.5 m into Class II sandstone.

Fulton Hogan

FOXGROUND-BERRY BYPASS

BERRY

Installation of 3 no. temporary bridges comprising 610 mm diameter CHS cased bored piles socketed 1.5 m into Class II sandstone.
Emanon Shoring - Sheet Piling Contractors